Simulasi Pembangkit Listrik Tenaga Surya Sistem Hybrid PLN PLTS Pada Gedung A Unbari Jambi (Menggunakan Software System Advisor Model (Sam) 2021,12,2)

Agus Suprianto, Eko Suprapto, Venny Yusiana

Abstract


Solar panels can be developed to meet the needs of electrical energy. This study was made as a comparison between the costs incurred by Batanghari University when using electricity sources from PLN compared to using electricity sources from solar power plants that are planned, in order to find out the amount of investment costs that are more efficient in a period of months or even years. The design of the calculation of electrical power using SAM, in building A UNBARI. This object was chosen because it uses various electrical loads that are used throughout the day. Load data and total power and electrical energy costs in this building will be used as a comparison for the costs incurred by the planned Hybrid Power Plant (PLTH). The simulation of solar power plants with software with SAM shows that it can almost meet the needs in Building A of Batanghari University and the payback time does not exceed the economic life of a plant, which is 25 years. Based on the results of the study, the PLN PLTS hybrid system project in building A of Batanghari University can be reliably because it meets the eligibility criteria. With data from the results of the calculation of software with SAM, namely a pay back period of 16 years and 4 months, compared to the estimated average lifespan of solar panels which reaches 25 years, the study of PLN PLTS hybrid solar power plants will generate good income for the future.

Keywords


Solar Power Plant, Hybrid and SAM

Full Text:

PDF

References


Senen, Adri, and Titi Ratnasari. "Studi Interkoneksi Pembangkit Listrik Tenaga Biomassa 1 x 9, 9 MW di Deli Serdang." Journal of Applied Agricultural Science and Technology 3.1 (2019): 41-50.

Mariya, J. P. "Perancangan Perancangan Interkoneksi Pembangkit Listrik Tenaga Surya 1 MWp On-Grid Pada Jaringan Distribusi Cileungsi." SUTET 9.2 (2019): 112-124.

I. Kholiq, “Pemanfaatan energi alternatif sebagai energi terbarukan untuk mendukung subtitusi bbm,” iptek, vol. 19, no. 2, pp. 75–91, 2015.

M. Rif, S. Hp, M. Shidiq, R. Yuwono, and H. Suyono, “Optimasi Pemanfaatan Energi Listrik Tenaga Matahari di Jurusan Teknik Elektro Universitas,” vol. 6, no. 1,pp.44–48,2012.

I. M. A. Nugraha, I. A. D. Giriantari, and I. N. S. Kumara, “Studi Dampak Ekonomi dan Sosial PLTS Sebagai Listrik Pedesaan Terhadap Masyarakat Desa Ban Kubu Karangasem,” no. November, pp. 14–15, 2013.

Apri Anggi Prayogi Berdasarkan analisis ekonominya maka didapatkan nilai NPC sebesar Rp236.319.432,00, initial capital cost sebesar Rp 309.287.120,00, Cost of Energy sebesar 604,349 Rp/kWh, dan BEP selama 11 tahun 5 bulan. 2018

S.G., Ramadhan DanCh.Rangkuti Perencanaan Pembangkit Listrik Tenaga Surya DiAtap Gedung Harry Hartanto Universitas Trisakti 2016

P.A Sujana INS kumara I.A.D.giriantri pengaruh kebersihan modul surya terhadap kerja PLTS e jounal SPEKTRUM. 2015 VOL. 2,NO 3 49-54.

Peratuan menteri ESDM no 12 tahun 2017 tentang pemanfatan sumber energy terbarukan untuk penyedian tenagalistrik

Keputusan menteri ESDM no 1772 tentang besaran biaya pokok penyedian pembangkit pt perusahaan listrik Negara tahun 2017




DOI: http://dx.doi.org/10.33087/jepca.v8i1.154

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Journal of Electrical Power Control and Automation (JEPCA)
Program Studi Teknik Listrik, Fakultas Teknik, Universitas Batanghari
Adress: Jl. Slamet Ryadi, Broni-Jambi, Kodepos: 36122, email: teknikjepca@gmail.com

Creative Commons License This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.